Skip to main content
Yale University

The Schmuttenmaer Research Group 

  • C.A. Schmuttenmaer
  • Members
  • Publications
  • Techniques
  • News
  • Photos
  • Calendar
  • Research
  • Resources
  • Tributes to Charlie
Home > Galleries > Lab Renovation and Moving

Lab Renovation and Moving

Slideshow image: 
  • Dan, Mike, and Becky repaint some electronics racks for the new space.
  • Charlie, Dan, and Mike help the professionals lift one of the laser tables.
  • Mike and Becky work to level one of the laser tables.
  • Becky inspects our new amplified laser system.
  • The prep room before move-in.
  • Looking towards the vestibule and computer room.
  • The main lab space before moving in.
  • Loading the laser tables on the flat bed.
  • Laser tables on the flat bed at the end of the loading dock.
  • Becky wheeling all of the optics out of the old lab.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  • Previous
  • Next
Yale

Accessibility at Yale · Privacy policy
Copyright © 2025 Yale University · All rights reserved

  • Facebook
  • Twitter
  • Flickr
  • iTunes
  • YouTube