Lab Renovation and Moving

Dan, Mike, and Becky repaint some electronics racks for the new space.
Charlie, Dan, and Mike help the professionals lift one of the laser tables.
Mike and Becky work to level one of the laser tables.
Becky inspects our new amplified laser system.
The prep room before move-in.
Looking towards the vestibule and computer room.
The main lab space before moving in.
Loading the laser tables on the flat bed.
Laser tables on the flat bed at the end of the loading dock.
Becky wheeling all of the optics out of the old lab.